Page 2

HSE PHILOSOPHY 

ADMA‐OPCO Document No.  :  AD219‐705‐S‐PHY 07001  Rev. 

NPCC Document No.   :  3291‐U‐RP‐001  0 
 

 
13/11/2014  3291‐U‐RP‐001 Rev 0  2 OF 33 
 


REVISION CONTROL SHEET

Rev No. Date
Rev.
Shts.

Details of Revision

A 02/09/2014 All Issued For IDC

B 21/09/2014 All Issued for Review/Approval

0 02/11/2014 All COMPANY Comments Incorporated and Issued for Design

Page 16

13/11/2
 

6.2

6.3
6.3.1

 
A

N

2014 

All wellhe
exception
gas lift fa
WHT-7 w
lift gas fa
Flow Met
under EP
online te
control op

The WHT
to allow t
dispersio
to meet H
approxim



Wellhead
New wellh

C
M
Pr
G
W
W
G

fa
W
Ve
D
D
An
C
D

W
D

W
Hy
N
N
18

La

Subsea P
1 Well F
Well fluid

Table-1: W

From

DMA‐OPCO 

PCC Docume

ead towers
n of WHT-7
acilities. Lif

will not have
acilities on
ters and co

PS are equi
sting. We
peration fro

Ts are provi
the top side
n analysis s
H2S and hy

mately 5 m a

d Towers (W
head towers

onventiona
Multi-Phase

roduction P
as Lift Rece

Water Injectio
Water Injectio

as Lift Syst
acilities on W

Water Injectio
ent and Dra
rain Sump T
rain Pump
nnulus Leak
orrosion Inh
own-hole C

WHTs excep
own-hole C

WHT-3 & 4
ydrate Inhib
itrogen Pac
itrogen Pac
80 gallon
aunchers/R

Pipelines
Fluid Pipeli
pipelines a

Well Fluid Pipe

To

HS

Document N

ent No. 

32

s have pro
7. WHT-7 w
ft gas is re
e Thamama
WHT-7. T

onventional
pped with M

ellhead towe
m super co

ided with a
e pipelines
shall be ca
ydrocarbon

above the he

WHT-3, 4, 5
s (WHT-3, 4

l Production
Flow Meter

Pig Launche
eiver on WH
on Receive
on Launche
tem on all W

WHT-7)
on system
ain System
Tank

k Measurem
hibitor Injec
Corrosion In
pt WHT-7
Corrosion In

bitor Injectio
ckage (for p
ckages (for
Potable W

Receivers)

nes
re provided
elines

Pipe
Diam

SE PHILOSO

No.  :  AD21

:  3291

291‐U‐RP‐001

oduction, w
will have pr
equired for
a V producti
The seven
manifolds
Multiport Se
ers are de
mplex.

drain sump
blowdown

rried out to
LEL on th

elideck.

5, 6, 7, 8 an
4, 5, 6, 7, 8

n and Test M


er on WHT-3
HT-3, 4, 6 &
r on WHT-3

er on WHT-
WHTs exce

ment System
ction Packag
nhibitor Pac

nhibitor Pac

on Package
urging)
blanketing o
ater Interm

d in table be

line Nom
meter (Inch)

OPHY 

19‐705‐S‐PHY

1‐U‐RP‐001

1 Rev 0

water injecti
roduction a
production
ion. Space
(7) new W
for online

elector Man
esigned for

p tank and a
and to fac

confirm he
he WHT wo

nd 9)
& 9) shall c

Manifold

3, 4, 6, 7 &
& 8 (future s
3, 4, 5, 6, 7,
5 & 9
ept WHT-7

m
ge
ckage (For

ckage (For

e (Based on

of all chemi
mediate Bu

elow.

inal Appro
length

Y 07001 

0

on and ga
nd water in
of the Tha

e is reserved
HTs are eq
well testing

nifold and m
unmanned

a vent colle
cilitate perio
eight require
orking area

consist of fo

8
space provis
, 8 & 9

(Future spa

Gas Lift Sy

r Capillary

result of Hy

ical injection
lk containe

oximate Pi
h (KM)

Rev. 



as lift facili
njection fac
amama V r
d for future
quipped wit
g. The WH

multiphase f
d operation

ction with s
odic mainte
ement for th
s. The WH

ollowing ma

sion on WH

ace provisio

ystem) with

Injection) w

ydrate Inhib

n tanks)
er (for flu

ipeline

16 OF 33

ties with th
cilities, but n
reservoir an
expansion

th Multipha
HTs 1 and
flow meter f

with remo

stack system
nance. Ve
he vent sta
HT vents a

ain facilities:

HT-7)

on for lift g

h IRCD on

with IRCD o

bitor Study)

shing of P



he
no
nd
of
se
2
for
ote

ms
ent
ck

are



as

all

on

Pig

Page 17

HSE PHILOSOPHY 

ADMA‐OPCO Document No.  :  AD219‐705‐S‐PHY 07001  Rev. 

NPCC Document No.   :  3291‐U‐RP‐001  0 
 

 
13/11/2014  3291‐U‐RP‐001 Rev 0  17 OF 33 
 

WHT-3 WHT-2 12 4.7

WHT-4 WHT-5 18 4.8

WHT-5 NSMFT 18 6.1

WHT-6 NSMFT 10 5.2

WHT-7 NSMFT 10 4.9

WHT-8 WHT-9 14 4.2

WHT-9 NSMFT 14 5.6



6.3.2 Gas Lift Pipelines

Lift gas pipelines are provided in table below.
Table-2: Gas Lift Pipelines

From To
Pipeline Nominal
Diameter (Inch)

Approximate Pipeline
length (KM)

NSMFT WHT-2 6 3.8

WHT-2 WHT-3 6 4.7

NSMFT WHT-5 6 6.1

WHT-5 WHT-4 6 4.8

NSMFT WHT-6 6 5.2

NSMFT WHT-9 6 5.6

WHT-9 WHT-8 6 4.2



6.3.3 Water Injection Pipelines

Water injection pipelines are provided in table below.
Table-3: Water Injection Pipelines

From To
Pipeline Nominal
Diameter (Inch)

Approximate
Pipeline length (KM)

WHT-2 WHT-3 6 4.7

NSMFT WHT-5 10 6.1

WHT-5 WHT-4 6 4.8

NSMFT WHT-6 6 5.2

NSMFT WHT-7 6 4.9

NSMFT WHT-9 8 5.6

WHT-9 WHT-8 6 4.2

Page 32

13/11/2
 

21.0

21.1

22.0

23.0

24.0

 
A

N

2014 

OCCUPA
Since the
conceived
pose an
Philosoph
will cover
preparatio
shall disc
health an

Work sha
Health (O
recognize
All perso
be trained
Noise
Noise co
vibration
A Noise S
The follow
hearing, n







Project E
criteria &

HYDROG
H2S prec
particular
SCBA etc

CHEMIC
Suitable p
accidenta
decide th

COMMU
WHT’s w
mean of
communi

DMA‐OPCO 

PCC Docume

ATIONAL
e WHTs are
d during op
occupation

hy/Plan to b
r all phases
on, pre-com
cuss the m

nd hygiene r

all comply
OH) manage
ed, assesse
nnel (const
d in use of P

ontrol is inte
that may af

Study will be
wing maxim
noise levels

The absol
Emergency
durations.
Noise in co
not exceed
Noise in se
During norm


Environment
control req

GEN SULP
cautions in
r, portable H
c. are provid

CAL EXPO
precaution
al exposure
e necessar

NICATION
will be provi

communic
cations &

HS

Document N

ent No. 

32

HEALTH P
e being a no
peration sta
nal health t
be develope
s of the pro
mmissioning

medical faci
related requ

generally w
ement proce
ed and cont
truction, op
PPE’s, Sea

ended to p
ffect their he
e performed
mum noise
s required fo

ute allowa
y or Ceiling

ontrol rooms
60 dBA.

ervice space
mal operatio

tal Protectio
uirements.

PHIDE
n accordan
H2S detecto
ded on the f

SURE
shall be in
to chemica

ry protection

N & NAVIG
ded with V

cation (e.g.
hand held

SE PHILOSO

No.  :  AD21

:  3291

291‐U‐RP‐001

PHILOSOP
ormally unm
age of the
threat to co
ed & shall a
oject i.e. co
g, commiss
lities, medi

uirements.

with ADMA
ess aiming
rolled will b
eration and
Survival an

prevent pers
ealth and a
d by a spec
level limits

or adequate

ble noise
g Level). T

s and office

es shall not
ons, the ma

on Philosop

ce with A
ors shall be
facilities.

place and P
als used. M
n.

GATION SY
VOIP phone

VHF comm
radios for

OPHY 

19‐705‐S‐PHY

1‐U‐RP‐001

1 Rev 0

PHY
manned, no
project. Ho
onstruction
address the
nstruction,

sioning & s
cal emerge

A-OPCO Sa
to ensure t
e set up.

d maintenan
nd H2S expo

sonnel bein
bility to perf

cialist HSE c
s reflect the
e task perfo

level in a
This level s

es shall hav

exceed 65
aximum nois

phy shall b

DNOC CO
available a

PPE provid
MSDS of the

YSTEM
es as a par
munication
operating

Y 07001 

0

major occu
owever, the

workers. T
e Occupatio
commencin
tart-up acti
ency proce

afety Regu
that all fores

nce) engag
osure.

ng subject
form their d
consultant.
e requireme

ormance and

any situatio
shall never

ve target lev

dBA.
se level at p

e followed

OPV4-10/11
nd an adeq

ed for hand
e chemicals

rt of comm
for rescue
personnel)

Rev. 



upational he
constructio

The Constru
nal Health

ng with mob
vities to ha
dures and

lation. An
seeable OH

ged in offsh

to excessiv
uties in a sa

ents for co
d for person

on is 115
exceed ev

vels of 50 d

process are

for the app

shall be
uate numbe

dling and pr
s used will b

unication s
e & recove
) will be br

32 OF 33

ealth threat
on phase w
uction Safe
aspects. Th
bilization, s
andover. Th

occupation

Occupation
H hazards a

hore work w

ve noise an
afe manner

nservation
nnel comfor

dB ("Peak
ven for sho

BA, and sh

ea is 85 dBA

plicable noi

in place.
er of BA se

rotection fro
be referred

system. Oth
ry, helicopt
rought to th



is
will
ety
his
ite
his
nal

nal
are

will

nd
r.

of
rt:

k",
ort

all

A

se

In
ts,

om
to

her
ter
he

Page 33

HSE PHILOSOPHY 

ADMA‐OPCO Document No.  :  AD219‐705‐S‐PHY 07001  Rev. 

NPCC Document No.   :  3291‐U‐RP‐001  0 
 

 
13/11/2014  3291‐U‐RP‐001 Rev 0  33 OF 33 
 

WHT’s when visiting these platforms. Further details can be referred in
Telecommunication System Design Basis (Doc No. AD219-705-G-05051)

Navigational aids (including foghorn) for offshore installations shall be provided on each
WHT’s in accordance with the IALA, SOLAS requirements and local coastal protection
acts.

Wave off lights shall be provided on WHTs on helideck and boat landing area to warn
approaching helicopter or boats in case of a fire or a gas release on the tower. These
wave-off lights shall be designed as per CAP-437 requirements.