Download Construction Management Project Report PDF

TitleConstruction Management Project Report
TagsBootstrap (Front End Framework) Angular Js Java Script Digital & Social Media Digital Technology
File Size1.8 MB
Total Pages94
Table of Contents
                            CHAPTER – 1
BUDGET & COST
Provide easy to use cash flow and Earned Value capabilities to use forecasting and project measurements
SCHEDULING
	HYPER TEXT MARKUP LANGUAGE
ANGULARJS:
	Bootstrapper
	Two-Way Data Binding
BOOTSTRAP (FRONT-END FRAMEWORK)
	Features
	Structure and Function
		The CSS
		Re-Usable Components
		Javascript Components
			Benefits of Estimation Tool:
	Attach Documents Anywhere
	Scanning and Assignment Options
		Store and Share Unlimited Contacts
		Role-based Permissions
	White-box and black-box testing:
	8.2 TESTING STRATEGIES
	A sample testing cycle
	8.3 TEST CASES
Core HTML5 Canvas: Graphics, A
AngularJS Programming by Example
Kindle Edition
AngularJS: Novice to Ninja
                        
Document Text Contents
Page 1

CHAPTER – 1

1. INTRODUCTION

1.1 PROBLEM STATEMENT

To provide a user friendly and quick solution for the managing

sites through an online web application that can collaborate between

site engineers and managers from different sites In the present

system, all the refineries are not in single piece.

The Existing System for construction process is having the

human work. If the Company wants to check the day to day human

resources and equipment management logs is difficult task for human

capabilities from all the construction sites the user must go at every

place and check for the products so to overcome all this

disadvantages, a new system developed where in the user will get all

the details of the product at one place.

1.2 SCOPE

This Project investigates the entry threshold for providing a new

transaction service channel via the real options approach, where the

entry threshold is established by using an login system designed for

the use of Customers, Owner, Site Manager, Site Engineer. Where

creating users and content viewed by the users is controlled by owner

and no. of users is dependent on the owner where he supplied with

type of users while creating user id.

 User must have a valid user id and password to login to the

system.

2

Page 2

 If user forgets the password he can click forgot password option

or contact support team.
 If a wrong password is given thrice in succession, that account

will be locked and the customer will not be able to use it.
 When an invalid password is entered a warning is given to the

user that his account is going to get locked.
 After the valid user logs in he is shown the list of projects which

company owns. On selecting the desired construction site he is

taken to a page which shows his modules which he is

authenticated.
 User can request for the details of his project and completion

status.
 User can make a change in plan to site manager or site engineer

in the same project.
 User can transfer documents and photos of his construction

from his account to any other account with this application.
 In emails, if message was sent successful a notification should

appear to the customer, in case if it is unsuccessful, a proper

message should be given to the customer as to why it failed.
 User can request for project progression report and weekly

schedule.
 User can view his daily, weekly and monthly as well as annual

account statements. He can also take print out of the same.
 Generate reports at every section.
 Administrator can take a back up of the database for every

instance that is happening, periodically.
 All users are authenticated to avail the services.
 Support section is also included for end users benefit.

3

Page 48

This data flow diagram shows the actions that can be performed

by the user when updating a profile i.e., at first profile is viewed,

update data then the data is validated and stored to the database.

CHAPTER – 6

6. IMPLEMENTATION

6.1 PROJECT MODULES

Any project is impossible to develop as a single building block as

its purpose is to serve more than one functionality to the user which

makes it difficult to develop as a single block instead divided into the

number of parts which are called modules as each one of them serve

different purpose.

This kind of development in any industry helps in reducing

costs and risks at the same time increases the productivity very

much. We also had implemented this kind of engineering for our

project development which involves 8 modules each one of them is

49

Page 93

 In future we can increase the speed of application to make

works done in no time.

 These internet applications upon using get very intelligent.

 Once our project is successful, in future we are planning it to

bring it to mobiles as an application.

 The software in future gets the ledger book to note down each

and every penny you have spent.

CHAPTER – 11

11. BIBLIOGRAPHY

11.1 REFERENCE BOOKS

Book Name Author Publisher

The Book of JavaScript
2nd Edition

Dave Thau O’Reilly Media

94

Page 94

http://www.w3schools.com/
https://angularjs.org/
http://getbootstrap.com/
http://www.amazon.com/s/ref=dp_byline_sr_book_1?ie=UTF8&field-author=Sandeep+Panda&search-alias=books&text=Sandeep+Panda&sort=relevancerank

Similer Documents