Page 1

UMI @ hrij a+
KUWAIT OIL COMPANY (K.S.C.)

STANDARDS PUBLICATION

KOC STANDARD

FOR

CATHODIC PROTECTION OF INTERNAL
SURFACES OF STEEL TANKS & VESSELS

STANDARDS TEAM

DOC. NO. KOC-L-018

Page 2

KUWAIT OIL COMPANY (K.S.C.)

STANDARDS PUBLICATION

KOC STANDARD

FOR

CATHODIC PROTECTION OF INTERNAL

SURFACES OF STEEL TANKS & VESSELS

STANDARDS TEAM

Page 20

9.4.4 Positive and negative cables shall be of RED and BLACK color respectively.
Reference electrode cable shall be of different color.

9.4.5 All cables shall be clearly identified and numbered and tagging shall be provided
such that no confusion exists as to their purpose or point of origin or termination.

9.4.6 The cable and all connections are critical. Complete electrical isolation between
the cable / splice / connection and the environment is essential. Water ingress or
soil contact must not occur.

9.4.7 All cables shall be laid in single runs. No cable to cable splicing shall be made.

9.4.8 AC supply cable shall be armored direct burial type of suitable size. Contractor
shall provide voltage drop calculations to substantiate cable sizing.

Transformer Rectifier (TIR)

9.5.1 The T/R unit output ratings for CP systems shall satisfy the following
requirements:

a) A/C input 440V, 3 Phase, 50 Hz.

b) Minimum Output voltage 25V DC, or as specified by
design if higher rate is required.

c) Minimum output current rating : 10A DC, or as specified by
design if higher rate is required.

9.5.2 All T/R units shall comply with the requirements of 015-PH-1910.

9.6 Junction Boxes

9.6.1 Junction boxes shall be certified for use in respective classified area with
minimum degree of protection as IP55. The system design shall have the
following types of junction boxes:

a) AJB: Anode junction boxes.

b) TJB: Test junction boxes.

c) NJB: Negative junction boxes.

9.6.2 Inside the AJB, TJB & NJB, a layout drawing with a glass cover shall be fixed to
show the arrangement of permanent reference electrodes & power feed cables.

Page 21

INSTALLATION OF ANODES

Impressed Current Anodes Installations

10.1 . I Prior to installation, all materials including transformer 1 rectifiers, cables, anodes,
and junction boxes shall be inspected to ensure that they are in good condition
and comply with project specifications.

10.1.2 All electrical connections shall be made safe, secured and waterproof.

10.1.3 The transformer 1 rectifier shall be installed in secured, fenced and accessible
area as per KOC Drg. No. CP-004. External AC cut-off switch shall be connected.
The transformer I rectifier body shall be grounded.

10.1.4 The anodes lead wires shall be connected to a distribution box installed on the
top of the tank.

10.1.5 The anode main cable shall be connected to the positive terminal of the
transformer I rectifier and installed in a conduit to the top of the tank, where it is
connected to the distribution anode junction box (AJB).

The negative terminal of the transformer I rectifier shall be connected to the
structure to be protected. These installations have to be confirmed after
energizing the CP system by suitable measurements.

10.1.6 All electrical connections shall be as per clause 7.3.4 of this Standard.

10.1.7 The negative and positive CP cables shall be laid at 750 mm depth. After
installation the cables shall be covered with tiles and warning tapes followed by
backfilled with soil to the original condition.

10.1.8 Aboveground cable markers shall be installed to show the cable routes.

10.2 Galvanic 1 Sacrificial Anode Installations

10.2.1 The Contractor shall submit a procedure for the anodes' installation for KOC
review and approval.

10.2.2 Prior to installation, the following shall be inspected:

a) All materials shall be verified with Manufacturer's test certificate(s) and
project specifications.

b) The dimensions, weight and the material of the anodes to confirm
compliance with specifications.

c) Any crack shall be made sure that it is within the acceptable limits as per
NACE RP 0387 and NACE RP 0492.

d) Any damage during handling.

Page 39

I DOC. NO. KOC-L-018 Page 38 of 39

ACKNOWLEDGEMENT

This Standard has been approved by the Standards Technical Committee (STC)
consisting of the following:

Mr. AIRedha Al-Haddad Standards Team Chairman
Mr. Mohammad Emam Insp. & Corr. Team (WE) Deputy Chairman
Mr. S. Kumar Standards Team Secretary1 Member
Mr. A. Unnikrishnan Standards Team Member
Mr. Khalaf Hamada Design Team Member
Mr. N. Ramanathan Export Facilities Team Member
Mr. Ali Hassan Al-Failakawi HSE System Team Member
Mr. Daniel Pino Utilities Team Member
Mr. Abdul R. Al-Shamari Insp. & Corr. Team (N&WK) Member
Mr. Khalid Al-Ahmad Gen. Project Team Member
Mr. Abdul Aziz Akbar Project Mgmt. Team (NK) Member
Mr. Moataz Khalaf Information System Team Member

The draft of this Standard had been circulated to the KOC User Teams for review and
the responses were received from the following:

ENGINEERING GROUP TECHNICAL SERVICES DIRECTORATE

Team Leader Design Team Leader HSE (TS)

MAJOR PROJECTS GROUP (I) MAJOR PROJECTS GROUP (11)

Team Leader Export Fac. Projects Team Leader Project Support

AHMADI SERVICES GROUP GAS MGMT GROUP (SEK)

Team Leader Utilities Team Leader Gas Opns.

Team Leader Project Design Team Leader Consumer Networks

INDUSTRIAL SVCS. GROUP OPERATIONS GROUP (SK)

Team Leader Insp. & Corr. (S&EK) Team Leader Opns. Tech. Svcs

Team Leader Insp. & Corr. (N&WK) Team Leader Maintenance

OPERATIONS GROUP (EK) EXPORT & MARINE OPNS GROUP

Team Leader Maintenance Team Leader Export Svcs.

SECURITY & FIRE GROUP DRILLING OPNS GROUP

Team Leader Fire Team Leader Drlg. & WIO Svcs.

Page 40

DOC. NO. KOC-L-018 Page 39 of 39 REV. I

SOUTH & EAST DIRECTORATE WEST KUWAIT DIRECTORATE

Team Leader HSE (SEK) Team Leader HSE (WK)

HSE GROUP NORTH KUWAIT DIRECTORATE

Team Leader HSE Systems Team Leader HSE (NK)

Team Leader H&E

Team Leader Safety

Task Force Responsible for this Stqndard

The preparation of this Standard has been entrusted by the Standards Technical
Committee (STC) of the Task Force No. (TF-CPl02) comprising of the following members:

Mr. Abdul R. Al Shamari Insp. & Corr. (N&WK) TF Leader Tel No. 61426
Mr. Hasan Sabri Insp. & Corr. (S&EK) Member Tel No. 67489
Mr. Govinda Mishra Design Team Member Tel No. 61 097
Mr. Liakat Ali Maintenance (WK) Member Tel No. 20061
Mr. Uppara Saibaba HSE Systems Member Tel No. 71837
Mr. Narayan Ramanathan Major Projects (EFP) Member Tel.No. 66960